Roadmap

The engineering plan, written down.

A documented roadmap is a commitment to a direction, not a guarantee of dates. Items are revised as research and validation results become available.

Plan

Forward schedule

2026 · Q2
  • EDS rev. 4.1
    Public revision of the Engineering Documentation System.
  • TTP-Q
    Specification v1.2 published with hybrid migration profile.
  • AI Evaluation Harness
    Validated release, integrated into all AI projects.
2026 · Q3
  • Building Twin reference
    Reference architecture and instrumentation guide.
  • Developer Portal
    Public preview of API documentation and SDKs.
2026 · Q4
  • Threat Modelling 2.0
    Methodology revision incorporating supply-chain analysis.
  • Quantum Security Lab
    Open call for collaboration on PQC migration case studies.
2027
  • Cross-domain research
    First Future Concepts Lab cross-domain programme.
  • Industrial Automation
    New lab evaluation under Future Concepts.